Final Product |
Fire hazard testing – Part 2-11: Glowing/hot-wire based test methods – Glow-wire ¬ammability test method for end-products (GWEPT) |
TS EN 60695-2-11 EN 60695-2-11 IEC 60695-2-11 |
|||||
Household and similar electrical appliances |
Household and similar electrical appliances – Safety - Part 1: General requirements -Protection against accessing live parts -Input power and current -Leakage current and electrical resistance at operating temperature -Moisture resistance -Leakage current and electrical resistance -Mechanical strength - Heat and «re resistance -Annex A (For Information) Routine Experiments |
TS EN 60335-1 EN 60335-1 IEC 60335-1 Article 8 Article 10 Article 13 Article 15 Article 16 Article 21 Article 30.2.1 Article 30.2.2 Article 30.2.3 |
|||||
Final Product | Test B: Dry heat |
TS EN 60068-2-2 EN 60068-2-2 |
|||||
Final Product | Tests A: Cold |
TS EN 60068-2-1 EN 60068-2-1 |
|||||
Final Product | Test Eh: Hammer tests |
TS EN 60068-2-75 EN 60068-2-75 |
|||||
Final Product | Degrees of protection provided by enclosures (IP code) (For electrical equipments) tests |
TS 3033 EN 60529 EN 60529/A1 |
|||||
Final Product |
Test S: Simulated solar radiation at ground level and guidance for solar radiation testing and weathering |
TS EN 60068-2-5 EN 60068-2-5 |
|||||
Final Product | Tests Fc: Vibration (sinusoidal) |
TS EN 60068-2-6 EN 60068-2-6 |
|||||
Final Product | Test Db: Damp heat, cyclic (12 h + 12 h cycle) |
TS EN 60068-2-30 EN 60068-2-30 |
|||||
Final Product | Test Cab: Damp heat, steady state |
TS EN 60068-2-78 EN 60068-2-78 |
|||||
Final Product |
![]() |
TS EN 60068-2-27 EN 60068-2-27 |
|||||
Electricity metering |
Electricity metering equipment - General requirements, tests and test conditions - Part 11 : Metering equipment Applicable Tests -Power consumption 4.4 -Repeatability 7.8 -Meter constant 7.4 -Immunity to electrostatic discharges 9.3.3 -Initial start-up of the meter 7.5 -Test of no-load condition 7.6 -External static magnetic «elds 9.3.12 -Power frequency magnetic «eld immunity test 9.3.13 -Starting current test 7.7 -Limits of error due to variation of the current 7.9 -Test of time keeping accuracy 7.11 -Vibration test (Test Fc) 5.2.2 -Shock test (Test Ea) 5.2.1 -Harmonics in the current and voltage circuits 5th harmonic test 9.4.2.2 -Voltage variation 9.4.3 -Ambient temperature variation 9.4.4 -Interruption of phase voltage 9.4.5 -Frequency variation 9.4.6 -Reversed phase sequence 9.4.7 -Auxiliary voltage variation 9.4.8 -Operation of auxiliary devices 9.4.9 -Self-heating 9.4.11 -Dry heat test 8.3.3 -Cold test 8.3.4 -Damp heat, cyclic test 8.3.5 |
TS EN 62052-11 EN 62052-11 IEC 62052-11 Applicable Tests Article 4.4 Article 7.8 Article 7.4 Article 9.3.3 Article 7.5 Article 7.6 Article 9.3.12 Article 9.3.13 Article 7.7 Article 7.9 Article 7.11 Article 5.2.2 Article 5.2.1 Article 9.4.2.2 Article 9.4.3 Article 9.4.4 Article 9.4.5 Article 9.4.6 Article 9.4.7 Article 9.4.8 Article 9.4.9 Article 9.4.11 Article 8.3.3 Article 8.3.4 Article 8.3.5 |
|||||
Luminaires | Luminaires - Part 1: General requirements and tests |
TS EN 60598-1 EN 60598-1 IEC 60598-1 |
|||||
Electromagnetic compatibility |
Electromagnetic compatibility (EMC) -- Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test |
TS EN 61000-4-2 EN 61000-4-2 IEC 61000-4-2 |
|||||
Electricity metering equipment |
Electricity metering equipment - Particular requirements - Part 23: Static meters for reactive energy (classes 2 and 3) Applicable Tests -Repeatability 7.8 -Meter constant 7.4 -Initial start-up of the meter 7.5 -Test of no-load condition 7.6 -Starting current test 7.7 -Limits of error due to variation of the current 7.9 -Time-keeping accuracy 7.11 -Climatic conditions 8 |
TS EN 62053-23 EN 62053-23 Applicable Tests Madde 7.8 Madde 7.4 Madde 7.5 Madde 7.6 Madde 7.7 Madde 7.9 Madde 7.11 Madde 8 |
|||||
Electricity metering equipment |
![]() energy (classes 0, 1S, 0,2S and 0, 5S) Applicable Tests -Repeatability 7.8 -Meter constant 7.4 -Initial start-up of the meter 7.5 -Test of no-load condition 7.6 -Starting current test 7.7 -Limits of error due to variation of the current 7.9 -Time-keeping accuracy 7.11 -Climatic conditions 8 |
TS EN 62053-22 EN 62053-22 Applicable Tests Article 7.8 Article 7.4 Article 7.5 Article 7.6 Article 7.7 Article 7.9 Article 7.11 Article 8 |
|||||
Electricity metering equipment |
Electricity metering equipment - Particular requirements - Part 21 : Static meters for AC active energy (classes 0, 5, 1 and 2) Applicable Tests -Repeatability 7.8 -Meter constant 7.4 -Initial start-up of the meter 7.5 -Test of no-load condition 7.6 -Starting current test 7.7 -Limits of error due to variation of the current 7.9 - Time-keeping accuracy 7.11 - Climatic conditions 8 |
TS EN 62053-21 EN 62053-21 Applicable Tests Article 7.8 Article 7.4 Article 7.5 Article 7.6 Article 7.7 Article 7.9 Article 7.11 Article 8 |
|||||
Electricity metering equipment |
Electricity metering equipment (a.c.) - Part 3: Particular requirements - Static meters for active energy (class indexes A, B and C) Applicable Tests -Repeatability 7.8 - Meter constant 7.4 - Initial start-up of the meter 7.5 - Test of no-load condition 7.6 - Starting current test 7.7 - Allowable errors due to variation of the current 7.9 - Allowable errors due to in¬uence quantities and disturbances 7.10 -Time-keeping accuracy 7.11 - Climatic conditions 8 -Accuracy in the presence of harmonics 8.7.7.7 |
TS EN 50470-3 EN 50470-3 Applicable Tests Article 7.8 Article 7.4 Article 7.5 Article 7.6 Article 7.7 Article 7.9 Article 7.10 Article 7.11 Article 8 Article 8.7.7.7 |
|||||
Electricity metering equipment |
Electricity metering equipment (a.c.) - Part 1: General requirements, tests and test conditions - Metering equipment (class indexes A, B, and C) Applicable Tests -Heating 7.2 - Immunity to electrostatic discharges 7.4.5 - Immunity to continuous magnetic «elds of external origin 7.4.11 - Immunity to power frequency magnetic «elds of external origin 7.4.12 -Dry heat test (Test B) 6.3.2 - Cold test (Test A) 6.3.3 -Damp heat, cyclic test (Test Db) 6.3.4 -Vibration test (Test Fc) 5.2.2.3 -Shock test (Test Ea) 5.2.2.2 -Spring hammer test (Test Eh) 5.2.2.1 -Protection against penetration of dust and water 5.9 - Resistance to heat and «re 5.8 |
TS EN 50470-1 EN 50470-1 Applicable Tests Article 7.2 Article 7.4.5 Article 7.4.11 Article 7.4.12 Article 6.3.2 Article 6.3.3 Article 6.3.4 Article 5.2.2.3 Article 5.2.2.2 Article 5.2.2.1 Article 5.9 Article 5.8 |
|||||
Tested Materials / Products | Name of Test | Testing Method (National, International Standards, In-house Methods) | |||||
Water Meters | Dry Heat Test (non-condensing) |
EN ISO 4064-2:2017 Article 8.2 OIML 49-2:2013 Article 8.2 2004/22/AT MI-001 2014/32/AB Annex 3 MI-001 EN 14154-3:2005 Article 6.2.1 75/33/AT Cold Water Meters |
|||||
Water Meters | Cold Test |
EN ISO 4064-2:2017 Article 8.3 OIML 49-2:2013 Article 8.3 2004/22/AT MI-001 2014/32/AB Annex 3 MI-001 EN 14154-3:2005 Article 6.2.2 75/33/AT Cold Water Meters |
|||||
Water Meters | Damp heat, cyclic (condensing) |
ISO 4064-2 Article 8.4 OIML R 49-1 Article 8.4 TS EN 14154-3+A2 Article 6.2.3 |
|||||
Water Meters | Flow disturbance tests |
EN ISO 4064-2:2017 Article 7.10 OIML 49-2:2013 Article 7.10 2004/22/AT MI-001 2014/32/AB Annex 3 MI-001 EN 14154-3:2005 Article 5.9 75/33/AT Cold Water Meters |
|||||
Water Meters | Overload water temperature test |
EN ISO 4064-2:2017 Article 7.6 OIML 49-2:2013 Article 7.6 2004/22/AT MI-001 2014/32/AB Annex 3 MI-001 EN 14154-3:2005 Article 5.7 75/33/AT Cold Water Meters |
|||||
Water Meters | Pressure Loss Test |
TS EN ISO 4064-2: Article 7.9 TS EN 14154-3+A1 Article 5.11 Cold Water Meters Regulation 75/33/AT : Article 3.4 2004/22/AT Measurement Devices Regulation: Annex MI-001 2014/32/AB Measurement Devices Regulation: Annex-3 MI-001 |
|||||
Water Meters | Static Pressure Test |
TS EN ISO 4064-2: Article 7.3 TS EN 14154-3+A1 Article 5.2 Cold Water Meters Regulation 75/33/AT: Article 3.3 2004/22/AT Measurement Devices Regulation : Annex MI-001 2014/32/AB Measurement Devices Regulation : Annex-3 MI-001 |
|||||
Water Meters |
Determination of intrinsic errors (of indication) |
TS EN ISO 4064-2: Article 7.4 TS EN 14154-3+A1 Article 5.4 Cold Water Meters Regulation 75/33/AT: Article 2 2004/22/AT Measurement Devices Regulation: Annex MI-001 2014/32/AB Measurement Devices Regulation: Annex-3 MI-001 |
|||||
Water Meters | Durability - Continuous Flow |
ISO 4064-2 Article 7.11 OIML R 49-1 Article 7.11 TS EN 14154-3+A2 Article 5.13 |
|||||
Water Meters | Absence of ¬ow test |
ISO 4064-2 Article 8.17 OIML R 49-1 Article 8.17 TS EN 14154-3+A2 Article 5.5 |
|||||
Water Meters | Water pressure test |
ISO 4064-2 Article 7.7 OIML R 49-1 Article 7.7 TS EN 14154-3+A2 Article 5.8 |
|||||
Water Meters | Reverse Flow Test |
TS EN ISO 4064-2 Article 7.8 OIML R 49-2 Article 7.8 2014/32/AB Measurement Devices Regulation (MI-001) TS EN 14154-3+A2 Article 5.12 |
|||||
Measuring systems for continuous and dynamic measurement of quantities of liquids other than water |
Performance tests |
OIML R 117 OIML R 118 |
|||||
Measuring systems for continuous and dynamic measurement of quantities of liquids other than water |
Dry Heat (Non-Condensing) Test |
OIML R 117 OIML R 118 |
|||||
Measuring systems for continuous and dynamic measurement of quantities of liquids other than water |
Cold Test |
OIML R 117 OIML R 118 |
|||||
Measuring systems for continuous and dynamic measurement of quantities of liquids other than water |
Damp Heat, Cyclic (Condensing) Test |
OIML R 117 OIML R 118 |
|||||
Heat Meters | Dry Heat Test (Non-Condensing) |
TS EN 1434-4:2015 Article 7.5 OIML R75-2:2002 Article 6.5 2004/22/AT MI-004 2014/32/AB Annex 6 MI-004 |
|||||
Heat Meters |
![]() |
TS EN 1434-4 Article 7.6 OIML R75-2:2002 Article 6.6 2004/22/AT MI004 2014/32/AB Annex 6 MI004 |
|||||
Heat Meters | Damp Heat, Cyclic Test(Condensing) |
TS EN 1434-4:2015 Article 7.9 OIML R75-2:2002 Article 6.9 2004/22/AT MI004 2014/32/AB Annex6 MI004 |
|||||
Heat Meters | Determination of Indication errors test | TS EN 1434-5 Article 6 | |||||
Water Meters | Water Temperature Test |
EN ISO 4064-2:2017 Article 7.5 OIML 49-2:2013 Article 7.5 2004/22/AT MI-001 2014/32/AB Annex 3 MI-001 EN 14154-3:2005 Article 5.6 75/33/AT Cold Water Meters |
|||||
Water Meters | Durability - Discontinuous ¬ow test |
ISO 4064-2 Article 7.11 OIML R 49-1 Article 7.11 TS EN 14154-3+A2 Article 5.13 |
|||||
Water Meters |
Static Magnetic Field Test (Magnet Test) |
TS EN ISO 4064-2:2015 2014/32/AB Measurement Devices Regulation (MI-001) |
|||||
Heat Meters | Performance tests |
TS EN 1434-4:2015 Article 7.4 OIML R75-2:2002 Article 6.4 2004/22/AT MI-004 2014/32/AB Annex 6 MI-004 |
|||||
Heat Meters | Flow Disturbances |
TS EN 1434-4:2015 Article 7.22 2004/22/AT MI-004 2014/32/AB Annex 6 MI-004 |
|||||
Heat Meters | Internal Pressure |
TS EN 1434-4:2015 Article 7.18 OIML R75-2:2002 Article 6.16 2004/22/AT MI-004 2014/32/AB Annex 6 MI-004 |
|||||
Heat Meters | Pressure Loss Test |
TS EN 1434-4:2015 Article 7.19 OIML R75-2:2002 Article 6.17 2004/22/AT MI-004 2014/32/AB Annex 6 MI-004 |
|||||
Water Meters |
Water meters for cold potable water and hot water - Part 2: Test methods |
TS EN ISO 4064-2 | |||||
Cold and Hot Water Meters Flow Meter (DN 15-200) |
![]() (Interruption in battery supply) |
EN ISO 4064-2 Article 8.5.4 OIML 49-2 Article 8.5.4 2004/22/EC MI-001 (* It was repealed on 29.06.2016 but was temporarily included in the scope of accreditation upon the request of the organization.) 2014/32/EU MI-001 Cold Water Meter Directive 75/33/EC (* It was repealed on 07.08.2008 but was temporarily included in the scope of accreditation upon the request of the organization) (*This test is performed at the other location for DN50 and above meters.) |
|||||
Cold and Hot Water Meters Flow Meter (DN 15-200) |
Electrostatic discharge |
EN ISO 4064-2 Article 8.11 OIML 49-2 Article 8.11 2004/22/EC MI-001 (* It was repealed on 29.06.2016 but was temporarily included in the scope of accreditation upon the request of the organization.) 2014/32/EU MI-001 EN 14154-3+A2:2013 Article 6.3.1 (* It was repealed on 18.02.2015 but was temporarily included in the scope of accreditation upon the request of the organization) Cold Water Meter Directive 75/33/EC (* It was repealed on 07.08.2008 but was temporarily included in the scope of accreditation upon the request of the organization) (*This test is performed at the other location for DN50 and above meters.) |
|||||
Heat Meters (DN 15-50) |
Electrostatic discharge |
TS EN 1434-4 Article 7.15 OIML R75-2 Article 6.13 2004/22/EC MI-004 (* It was repealed on 29.06.2016 but was temporarily included in the scope of accreditation upon the request of the organization.) 2014/32/EU MI-004 (*This test is performed at the other location for DN50 and above meters.) |
|||||
Heat Meters (DN 15-50) |
Static deviations in supply voltage |
TS EN 1434-4 Article 7.7 OIML R75-2 Article 6.7 2004/22/EC MI-004 (* It was repealed on 29.06.2016 but was temporarily included in the scope of accreditation upon the request of the organization.) 2014/32/EU MI-004 (*This test is performed at the other location for DN50 and above meters.) |
|||||
Cold and Hot Water Meters Flow Meter (DN 15-200) |
Changes in power supply (Water meters powered by external DC voltage or by primary DC batteries) |
EN ISO 4064-2 Article 8.5.3 OIML 49-2 Article 8.5.3 2004/22/EC MI-001 (* It was repealed on 29.06.2016 but was temporarily included in the scope of accreditation upon the request of the organization.) 2014/32/EU MI-001 EN 14154-3+A2:2013 Article 6.4.5 (* It was repealed on 18.02.2015 but was temporarily included in the scope of accreditation upon the request of the organization) Cold Water Meter Directive 75/33/EC (* It was repealed on 07.08.2008 but was temporarily included in the scope of accreditation upon the request of the organization) (*This test is performed at the other location for DN50 and above meters.) (*This test is performed at the other location for DN50 and above meters.) |